Skip to main content

rotations

A rotation is an ordered list of people plus a cadence. PosKit uses it to compute who is covering at any moment.

Creating and editing rotations needs on-call:edit.

tip

The schedule anchor is the single most important field on the form — the first member's first shift starts there, and every hand-off afterwards is the anchor plus whole shift lengths. Set it to the exact moment you want the first hand-off. See the anchor decides everything.

the rotations list​

Each row shows:

ElementExample
NameThe rotation's name
Cadence badge"weekly · hands off Mon 09:00", or "every 24h"
Paused badgeShown when the rotation is disabled
Member countHow many people are in the rotation
Anchor"anchored {date}"
TimezoneThe rotation's timezone label

The row menu offers Edit, Pause / Resume and Delete.

caution

Delete removes the rotation and all its overrides. Past audit entries are preserved, so the record of who was routed to historically survives — but the schedule and any overrides do not.

the rotation form​

The form describes itself: "Members rotate in the order shown. The schedule is computed from the anchor; edits apply immediately."

FieldNotes
NameRequired
CadenceWeekly or Custom interval
Shift length (hours)Custom only. 1 to 2160, default 24. "Each member covers this many hours before handing off"
Schedule anchorDate and time. "The first member's first shift starts here"
TimezoneType-ahead field listing IANA timezones, prefilled from your browser
Members in rotation orderAn ordered list with up, down and remove controls, plus an "Add a member…" picker

Limits: 1 to 50 members, no duplicates.

note

Edits apply immediately. Changing the anchor or the member order on a live rotation changes who is on call right now, with no confirmation step. Make changes at a quiet point in the cycle where you can.

how the schedule is computed​

info

No shift rows are stored. There is no table of shifts to inspect or correct. Who is on call is computed on demand from three things:

  1. The anchor.
  2. The shift length — 7 days for weekly, or the custom hours.
  3. The member order.

PosKit counts how many whole shift lengths have elapsed since the anchor, and cycles through the member list in order.

This is why the rotation is always internally consistent, and why there is nothing to repair if it drifts — it cannot drift. It also means the anchor is the single most important field on the form.

the anchor decides everything​

For weekly rotations the hand-off boundary is the anchor plus 7-day multiples — the form shows the resulting day and time ("Hand-offs happen every Monday at 09:00") as you set the anchor, and the rotation badge is derived from the anchor too, so what is displayed is always what actually happens.

If you want handovers every Monday at 09:00, set the anchor to a Monday at 09:00.

timezone​

For weekly rotations, hand-offs follow the rotation's timezone across daylight-saving changes: a rotation handing off Mondays at 09:00 in Europe/London hands off at 09:00 local all year, in GMT and BST alike.

note
  • Custom-interval rotations are exact elapsed hours and ignore the timezone — an "every 36 hours" rotation has no local wall-clock to preserve.
  • If the timezone value is not a recognised IANA name, the schedule falls back to absolute 7-day steps from the anchor (no DST adjustment). Pick the zone from the field's suggestions rather than typing freehand.

members​

Members rotate strictly in the order shown, cycling back to the top. Reorder with the up and down controls, and add people with the "Add a member…" picker.

Between 1 and 50 members, with no duplicates. A one-member rotation is valid and simply means that person is always on call.

tip

Order the list so consecutive shifts do not land on the same team or the same site. With the cycle being purely positional, the order you type is the order people are woken in — forever, until someone changes it.

pausing​

Pause disables a rotation, and it shows a paused badge in the list.

note

Because on-call routing uses the first enabled rotation, pausing the only rotation an organisation has means on-call routing has no rotation to resolve. Check what any existing on-call alert actions will do before pausing.

worked example​

You want a four-person weekly rotation handing over Mondays at 09:00, starting Monday 12 January.

  1. Name — "primary on-call".
  2. Cadence — Weekly.
  3. Hand off on / at — Monday, 09:00.
  4. Schedule anchor — Monday 12 January, 09:00. This is the field that matters; make it match step 3 exactly.
  5. Members — add all four in the order you want them woken.
  6. Save.

From then on: member 1 covers 12–19 January, member 2 covers 19–26 January, and so on, cycling back to member 1 after member 4.

Confirm with the Who's on call widget — it shows the current person and "hands off in …", which is the quickest check that the anchor is doing what you intended.

  • on-call — the widget, overrides, taking a shift, and scope limitations
  • alert actions — what can and cannot be configured on a rule