Skip to main content

cal management

CAL management deploys CAL packages to Simphony workstations, and shows you where each package has landed across your estate.

caution

It needs an active CCAPI integration. See oracle simphony integrations.

three tabs​

TabAnswers
PackagesWhere is each package installed, scheduled, or not reported?
LocationsIs each location up to date, and what failed or is still due?
TimelineWhat is upcoming, and how did recent deployment waves go?

All three read the same coverage data, so switching tabs never reloads it. Use Refresh to rebuild it from Simphony straight away.

info

The first load after a while can show a "building device mappings" or "building install history" banner. Install results can't be matched to locations until that finishes, about a minute. The page refreshes itself when it's done.

building or changing schedules​

New Schedule opens a wizard: pick packages, choose targets (locations, or individual workstations), set the action — Install or Skip — and an optional effective date.

The wizard also changes schedules in bulk. Before anything is sent, a review step lists:

  • schedules that will be created
  • schedules that already exist and are unchanged
  • conflicts — existing schedules whose action or date would change, shown as current vs proposed

A conflict is only overwritten if you confirm it in the review step, so a deliberate Skip is never silently turned back into an Install. To switch many workstations from Install to Skip (or back), run the wizard over them with the new action and confirm the conflicts.

note

Schedules can't be deleted from this page. Set them to Skip instead.

tip

A schedule says what was asked for; the Packages and Locations tabs show what actually happened on each workstation. Check them after a schedule has had time to run.

every change needs integration:edit​

caution

Creating or changing schedules, and Refresh, require integration:edit, which is manager and above. Read access is not enough to deploy anything.